Our Projects
Thomson CC Project
Automation SystemsAt Thomson CC Project, we successfully executed the supply, installation, and commissioning of an advanced Building Management System (BMS) and electrical infrastructure to enhance automation and efficiency.
Labrador Tower
BMS - Labrador TowerAt BMS - Labrador Towe, To supply of manpower, materials and tools to install 20mm GI conduit pipe with accessories to lay jumper cable and link back to sensing cables (approximately around 100 meters) To supply of manpower, materials and tools to installation of leak deduction control panels with testing commissioning
Police Coast Guard
BMS System - PSA Police Coast GuardBMS Engineering and Trading Pte Ltd successfully supplied, installed, and commissioned a complete Building Management System (BMS) for the PSA Police Coast Guard House using Schneider BMS for enhanced security, energy efficiency, and automation.
UOB Plaza
BMS System - UOB PlazaInstallation accessories for AHU, Fire Alarm, and MV fans IO points. Dismantle existing cables and cable support systems, and dispose of them appropriately..
Club Street
BMS System - Club StreetResponsible for programming, graphics development, database creation, engineering activities, testing, and commissioning for the BMS (Building Management System) at Club Street Hotel. This includes both low-level and high-level point integration.
Pall Lion
BMS System - Pall LionBMS – 370 Low-Level I/O Points Engineering programming, graphics creation, and database setup. Point mapping, testing, and commissioning of 370 low-level I/O points.BMS – 123 High-Level I/O Points Engineering programming, graphics creation, and database setup. Point mapping, testing, and commissioning of 123 high-level I/O points.
TYJ Woodlands
BMS System - TYJ WoodlandsEngineering Works, Graphic Design, Mapping, and Testing & Commissioning of 115 VAV Units.
Sengkang HDB
BMS System - Sengkang HDBEngineering programming works, graphics creation, database, mapping points and testing commissioning for BMS IO points